Waterproofing systems

This document is only available with a paid isurv subscription.

Most construction textbooks show asphalt built up in 2 coats, with an angle fillet at the wall/floor junction and a 50mm thick cement infill placed between vertical asphalt and an inner brick or block wall. Horizontal floor asphalt in 3 coats is protected and loaded by a cement/sand screed, sometimes...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.