Standards and frameworks

This document is only available with a paid isurv subscription.

Sitting above the NRM suite is the International Cost Management Standard (ICMS). It is a principle-based international standard that sets out how to classify, define, measure, record, analyse, present and compare construction project life-cycle costs in a structured and logical format.  Figure 2: ICMS/NRM hierarchy (taken from RICS NRM1, third edition). The driving principle...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.