Maintenance and re-basing

This document is only available with a paid isurv subscription.

To maintain accurate EVM reporting requires maintaining a current and accurate PMB as the basis for all progress reporting. If the PMB falls into disrepair, the accuracy and benefit of EVM is very much reduced. To achieve this, changes must be incorporated into the PMB in an accurate and timely manner....