Analysis, review and action

This document is only available with a paid isurv subscription.

The critical outputs of EVM are schedule and cost variances, which evidence how well you are performing against the PMB schedule and which actions are required to mitigate performance. An example of a typical EVM output, with the relevant variances, is shown in Figure 1. Figure 1: Typical EVM output (Source:...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.