ARCHIVED: Cost analysis and benchmarking – Chinese translation, 1st edition (July 2013–June 2022)

This document has been archived and is available on isurv for information purposes only.

This is part of the RICS QS and Construction Standards.

Please be aware that this guidance note contains some material which is in the process of being updated for revisions to the CDM Regulations, RIBA Plan of Work, and updates to the JCT, NEC and FIDIC suites. Members are made aware of these impending revisions in order that they first check the most up to date position before electing to act in accordance with this guidance document.

  • File type: PDF
  • Size: 2.5 MB

Your download should start automatically;
if it doesn't please click below.

In some browsers you may need to click the security bar at the top or bottom of the screen and select to download the file.

To manually start the file download, use the link below.

Download