Element 8.8: Minor building works and ancillary buildings

Group element 8 comprises the following elements:

8.1 Site preparation works

8.2 Roads, paths, pavings and surfacings

8.3 Soft landscaping, planting and irrigation systems

8.4 Fencing, railings and walls

8.5 External fixtures

8.6 External drainage

8.7 External services

8.8 Minor building works and ancillary buildings

Note: This group element of tabulated rules of measurement has been aligned with NRM 1 to create a standardised costs structure that links all construct (C) sub-element, components and inclusions with the ‘applicable’ renewal (R) and maintain (M) work items. Specific construction works that are not applicable (N/A) to maintenance works have been identified throughout.

  • File type: PDF
  • Size: 35.21 KB

Your download should start automatically;
if it doesn't please click below.

In some browsers you may need to click the security bar at the top or bottom of the screen and select to download the file.

To manually start the file download, use the link below.

Download