NRM 3 Group element 8: External works
Group element 8 comprises the following elements:
8.1 Site preparation works
8.2 Roads, paths, pavings and surfacings
8.3 Soft landscaping, planting and irrigation systems
8.4 Fencing, railings and walls
8.5 External fixtures
8.6 External drainage
8.7 External services
8.8 Minor building works and ancillary buildings
Note: This group element of tabulated rules of measurement has been aligned with NRM 1 to create a standardised costs structure that links all construct (C) sub-element, components and inclusions with the ‘applicable’ renewal (R) and maintain (M) work items. Specific construction works that are not applicable (N/A) to maintenance works have been identified throughout.