Element 11.3: Main contractor’s design fees

Group element 11 comprises the following elements:

11.1 Consultants’ fees
11.2 Main contractor’s pre-construction fees
11.3 Main contractor’s design fees

Note: Only applicable where a main contractor-led design and build contract strategy is to be used.

Note: Where the unit of measurement for a component or a sub-component has been given as ‘per week’, a week shall mean a period of 7 calendar days irrespective of public holidays.

Effective from 1 January 2013

  • File type: PDF
  • Size: 25.42 KB

Your download should start automatically;
if it doesn't please click below.

In some browsers you may need to click the security bar at the top or bottom of the screen and select to download the file.

To manually start the file download, use the link below.

Download