British Steel Corp v Cleveland Bridge & Engineering (1981)
This document is only available with a paid isurv subscription.
[1981] 24 BLR 94
Construction claim - time for completion - reasonable time - no contract - quantum meruit - circumstances at time of performance
This dispute arose out of the manufacture and supply of steel castings required for the formation of the roof nodes at...