Pre-survey

This document is only available with a paid isurv subscription.

There are five key aspects to the pre-survey stage for a planned preventive maintenance (PPM) survey:

  • preparation of a brief and client instruction
  • desk survey and document review
  • arranging access
  • appointing subconsultants
  • survey equipment and
  • risk assessment.