Performance evaluation

This document is only available with a paid isurv subscription.

Evaluation of compliance requirements should be carried out following the process shown in Figure 8.

Figure 8

Figure 8: Compliance methods (© David Inman)

This process should be done as specified above, or when there are changes to compliance requirements and operations.

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.