Design and Construction Version – June 2018

This document is only available to subscribers. Please sign up for a free trial below

In June 2018 the ICC produced revised versions of the Infrastructure Conditions of Contract in relation to: Design and Construct Version; and Target Costs Version. Design and Construction Version – June 2018 This provides that Design Works relate to the Permanent Works as defined. There is scope for the Employer Designed Works as part of...

Please note this page is only available to isurv subscribers. Sign up for a free-trial to access this content.