Design and Construction Version – June 2018

This document is only available to paying isurv subscribers.

In June 2018 the ICC produced revised versions of the Infrastructure Conditions of Contract in relation to: Design and Construct Version; and Target Costs Version. Design and Construction Version – June 2018 This provides that Design Works relate to the Permanent Works as defined. There is scope for the Employer Designed Works as part of...

Sign up for a free trial here. Please note that the free trial does not include access to downloads.

Or sign up to the isurv bulletin, our monthly newsletter detailing the latest content on isurv.

For further questions, don't hesitate to call: +44(0)247 686 8555.