Design and construction

This document is only available with a paid isurv subscription.

It is generally acknowledged that one of the major risks to a project can be from the uncertainty of what lies below the ground. When those risks occur, substantial extra cost and time delays can be incurred. In recognition of this, National Highways produced the directive CD 622 Managing geotechnical risk....

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.