Post-occupancy checklist

The primary purpose of a post-occupancy review is to establish the satisfaction of the customer (in this case, the end-user and occupier of the building) with the built facility they occupy. A post-occupancy review can be carried out on a newly completed building or an existing building where an occupier has taken occupancy with minimum work. In the latter, the review can be an assessment against the criteria for acquiring the lease of the building.

Prior to the post-occupancy review, information should be collated against a checklist, such as the one provided in this document.

  • File type: DOCX
  • Size: 208.87 KB

Your download should start automatically;
if it doesn't please click below.

In some browsers you may need to click the security bar at the top or bottom of the screen and select to download the file.

To manually start the file download, use the link below.

Download