• Skip to content
  • Skip to main navigation
  • Newsletter sign-up
  • Login / Register
RICS logo RICS iSurv logo isurv
Advanced search
Channels Show the navigation
  • APC and AssocRICS
  • Building surveying
  • Commercial property
  • Construction
  • Infrastructure
  • Planning
  • Professional conduct
  • Residential
  • Rural
  • Sustainability
  • Valuation
You are here:
  1. Home
  2. Research
  3. Modelling risk impacts and the variability between contract sum and final account (RICS)

Modelling risk impacts and the variability between contract sum and final account (RICS)

Published September 2012

This report looks at the prediction of construction costs, and the difference that varies between the contract sum and final account.

  • RICS: Modelling risk impacts and the variability between contract sum and final account
    • File type: PDF
    • Size: 3.03 MB
    • Download
  • Resources

    Resources

    • Document templates
    • RICS standards
    • Cases
    • Features
    • Research
    • Checklists
    • Insights
    • Data standards
    Close tab
  • RICS standards

    RICS standards

    • RICS standards
    Close tab
RICS logo RICS iSurv logo isurv
  • © 2023 isurv

  • About
  • Contact
  • Help
  • Accessibility
  • Terms and Conditions
  • Privacy policy

Suppliers

  • Designed and Powered by Jadu.
  • Twitter
  • LinkedIn