Group element 7: Work to existing buildings

Group element 7 comprises the following elements:

7.1 Minor demolition works and alteration works
7.2 Repairs to existing services
7.3 Damp-proof courses/fungus and beetle eradication
7.4 Facade retention
7.5 Cleaning existing surfaces
7.6 Renovation works

Note: Fit-out works in connection with a new building (i.e. built to shell and core) do not constitute works to existing buildings. Such fit-out works are to be measured as new works in accordance with the measurement rules.

Effective from 1 January 2013