Stages in the EIA process

This document is only available with a paid isurv subscription.

The table below outlines the main stages in the EIA process bringing out the differences between an NSIP and a project requiring consent from the LPA as appropriate. Stage Requirements Screening – determining whether a project requires EIA under the EIA Regulations Projects listed in Schedule 1 of the EIA Regulations – EIA is required.   Projects...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.