Retrospective delay analysis

This document is only available with a paid isurv subscription.

There are five main delay analysis techniques: as-planned v as-built as-planned impacted collapsed as-built windows analysis time impact analysis. The as-planned v as-built is a simple comparison between the planned programme and the as-built programme. It is therefore a simple graphical comparison between what was planned to happen and what in the event actually did happen. The as-planned...