Leading UK container terminals

This document is only available with a paid isurv subscription.

Berths 8 and 9 At Felixstowe, the 2 latest container terminals at berths 8 and 9 were completed in September 2011 with an overall length of 920m. Berth 9 was subsequently extended by a 190m-long pier, which was opened in November 2015. In 2011, the cost of constructing berths 8 and 9...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.