Planning and the environment

This document is only available with a paid isurv subscription.

At first sight, this might be perceived as a non-technical area. However, there are many constraints brought about by the need for compliance in these areas that drive technical requirements. All infrastructure projects have to respond to planning and environmental considerations, and the success or failure of the project can depend...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.