National infrastructure procurement frameworks

This document is only available to paying isurv subscribers.

The NHS Local Improvement Finance Trust (LIFT) initiative was introduced in England in 2000 to leverage private sector investment into regional primary care projects. The LIFT model created a long-term joint-venture (JV) between the public and private-sectors. In 2008 the Express LIFT model (eLift) was introduced to replace LIFT. Essentially...

Sign up for a free trial here. Please note that the free trial does not include access to downloads.

Or sign up to the isurv bulletin, our monthly newsletter detailing the latest content on isurv.

For further questions, don't hesitate to call: +44(0)247 686 8555.