Part 4: Tabulated rules of measurement for elemental cost planning

This document is only available to paying isurv subscribers.

4.5.1  Where the building project is to be procured through the use of works packages, the works allocated to elements and sub-elements can be reallocated to the applicable work package. This can be achieved by simply introducing one or more numeric suffix to each item in the cost plan (see...

Sign up for a free trial here. Please note that the free trial does not include access to downloads.

Or sign up to the isurv bulletin, our monthly newsletter detailing the latest content on isurv.

For further questions, don't hesitate to call: +44(0)247 686 8555.