Part 3: Measurement rules for cost planning

This document is only available to paying isurv subscribers.

3.9.1 Examples of templates showing the format, structure and content of elemental cost plans, based on level 1 and level 2 code levels, are provided at Appendix G and Appendix H to these rules.

Effective from 1 January 2013

Sign up for a free trial here. Please note that the free trial does not include access to downloads.

Or sign up to the isurv bulletin, our monthly newsletter detailing the latest content on isurv.

For further questions, don't hesitate to call: +44(0)247 686 8555.