Part 3: Measurement rules for cost planning

This document is only available to paying isurv subscribers.

3.2.1  Elemental cost plans are produced as an intrinsic part of RIBA Work Stages C: Concept, D: Design Development, E: Technical Design and F: Production Information; or, when the OGC Gateway Process is used, Gateways 3A (Design Brief and Concept Approval) and 3B (Detailed Design Approval). The requirements of RIBA...