Part 3: Measurement rules for cost planning

This document is only available to paying isurv subscribers.

3.18.1  Risk allowances, based on the results of a formal risk analysis, are to be included in each formal cost plan. Risk allowances are to reflect the employer’s risk exposure. In setting the amount of the risk allowances, the possible consequences of the employer’s residual risk should be taken into...

Sign up for a free trial here. Please note that the free trial does not include access to downloads.

Or sign up to the isurv bulletin, our monthly newsletter detailing the latest content on isurv.

For further questions, don't hesitate to call: +44(0)247 686 8555.