3.15.1  When preparing a cost estimate for main contractor’s overheads and profit, overheads and profit can be either combined as a single cost centre or treated as two separate cost centres (i.e. one being main contractor’s overheads and the other main contractor’s profit). Main contractor’s overheads and profit are...