Part 3: Measurement rules for cost planning

This document is only available to paying isurv subscribers.

3.11.1  The rules of measurement for building works (i.e. group elements 1 to 8) are detailed in Part 4: Tabulated rules of measurement for elemental cost planning. 3.11.2  The degree of detail to be measured for building work is to be related to the cost significance of the...

Sign up for a free trial here. Please note that the free trial does not include access to downloads.

Or sign up to the isurv bulletin, our monthly newsletter detailing the latest content on isurv.

For further questions, don't hesitate to call: +44(0)247 686 8555.