Expert reports

This document is only available with a paid isurv subscription.

Construction-related disputes are generally allocated to the multi-track procedure in the TCC in view of their complexity and value. There is no prescribed maximum length of an expert report, although the report should be as concise as is reasonably practicable (TCC Guide paragraph 13.7.2), in contrast to cases allocated to...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.