Value of BIM-enabled FM

This document is only available with a paid isurv subscription.

The BIM process and GSL identifies the need to engage those involved in the operational phase of a building during the design process and insures that the needs of the end users are specified within the brief. This process of requirement gathering has been identified as Organisational, Asset and Employers...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.