Other procurement options

This document is only available with a paid isurv subscription.

A popular method of securing greater cost and programme certainty during the procurement or early part of a construction process is through the use of a guaranteed maximum price (GMP). This is generally used with traditional (single-stage or two-stage) lump-sum contracts. At the appropriate time, perhaps after receipt of initial...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.