British Steel Corp v Cleveland Bridge & Engineering (1981)

This document is only available with a paid isurv subscription.

[1981] 24 BLR 94 Construction claim - time for completion - reasonable time - no contract - quantum meruit - circumstances at time of performance This dispute arose out of the manufacture and supply of steel castings required for the formation of the roof nodes at...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.