Substructure issues

This document is only available with a paid isurv subscription.

Even in a listed building a concrete floor may have been laid to replace older flooring, on the assumption that concrete is the superior material. However, the detailing must take into account practical workmanship issues. A line drawn on a plan to represent a damp-proof membrane is probably one of...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.