Pre-application development issues

This document is only available with a paid isurv subscription.

Applicants should consider the flood risk potential, as the local planning authority (LPA) may require a flood risk assessment. Check the Environment Agency flood risk map to determine what flood zone the site or property falls within. The location and size of the development planned will determine whether a flood risk assessment...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.