How to dry out buildings

This document is only available with a paid isurv subscription.

The drying process can be described as having three phases: removal of liquid water (pumping out, wet vacuuming, wet carpet removal, etc.) drying of material surfaces and drying of the material. Standing water should be physically removed prior to drying. This could be present: in lower parts of the building, e.g. below ground spaces, such as...