Environmental policy and management explained

This document is only available with a paid isurv subscription.

Using the example of a construction project, an environmental manager might ensure the following. Discoloured groundwater containing silt encountered during excavation for foundations is discharged to a foul sewer under consent rather than pumped into the local brook. Dust monitoring is undertaken during demolition, and potentially lethal ground gas is monitored for...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.