Case studies

This document is only available with a paid isurv subscription.

The M4 J19-20 and M5 J15-17 Smart Motorway was an £86m scheme to reduce congestion in the South West by opening the hard shoulder during peak times, and was opened to traffic in January 2014. The scheme used NEC3 (Option C) and despite the contract having already been awarded, the...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.