Measurement conventions

This document is only available with a paid isurv subscription.

This subsection contains an example of measuring bored cast-in-place concrete piling and associated excavation and concrete work, in accordance with CESMM4. Note the following items: Class P: piling requires that bored piling is measured in three ways: number of piles concreted length of piles and depth bored. The CESMM4 reference is given after each item. An allowance...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.