Commercial management of temporary works

This document is only available with a paid isurv subscription.

Most contracts are structured to ensure responsibility for TW lies with the contractor. This makes sense as, increasingly, infrastructure contracts are of a ‘design and build’ nature. If the interface between TW and PW remains with the contractor at all times, the PW should be more ‘buildable’. This should result...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.