Sandown Hotels Ltd v Phelps

This document is only available with a paid isurv subscription.

(1953) EG 595 Contract administration The architect was engaged to supervise the repainting of a seaside hotel and had wide experience of seaside conditions. The paint began to flake off prematurely because the wood surface had not been properly prepared for the painting. It was found that the architect failed...

Explore the subscription options here to get full access to isurv, including downloads.

Try isurv for free!

You can get instant access to a free, 7-day trial of isurv simply by filling in the free trial form. Please note that the free trial includes full access to isurv with the exception of downloadable content which is only available with a paid subscription.

Sign up for the isurv newsletter, to receive a monthly round-up of the latest isurv updates.

For further questions, don't hesitate to call: +44(0)247 686 8555.